Which of the following would be the result of adding ad…

A server’s runtime during power outages is too short to shut down properly. A system technician is asked to
remediate the problem. Which of the following would be the result of adding additional batteries to the UPS?

A server’s runtime during power outages is too short to shut down properly. A system technician is asked to
remediate the problem. Which of the following would be the result of adding additional batteries to the UPS?

A.
Increased load balancing

B.
Extended uptime

C.
Greater efficiency

D.
Increased power output



Leave a Reply 1

Your email address will not be published. Required fields are marked *


Tabassum Mehmood

Tabassum Mehmood

Congratulations!!! Luckily Completed CompTIA S+ SK0-004 Exam Recently!!!

Got a good score of 85x/900 (the passing line is 750/900).

I studied for a little over a month before I took the SK0-004 exam.

The SK0-004 exam a bit difficult, the actual SK0-004 questions were pretty straight forward.

I got total 100 questions, a lot of Tshoot questions. Only a handful of RAID questions unlike the SK0-003 that had a lot of RAID.

Some new questions FYI:

1. reconfigure a Linux
2. RAID configurations consists of mirrored disks
3. PDU power strip be connected
……

And, I do recommend you to use the PassLeader SK0-004 dumps for preparing for the test, all questions are from it.

Here, you can get part of PL SK0-004 dumps for free:

http://www.comptiadump.com/category/comptia-server-plus-certification/sk0-004-dumps

Good Luck!!!