Two technicians are asked to install a 6U server at location U25 in a 40U server rack. The rack has been
properly stabilized to the floor. Which of the following tools would BEST be used to install the server?
A.
A static strap.
B.
A server lift.
C.
A PDU.
D.
A UPS.