XYZ is a chemical manufacturing company. On a daily basis, it produces 100 kilos of Item A from
a single production batch. 100 kilos of item A manufactured from a single batch has a single
expiration date. However, the purity of item A varies as follows:
Category 1: 95%
Category 2: 85%
Category 3: 50%
From an implementation perspective, which setup or process would meet this requirement?
A.
Enable lot control. Map three categories as coproducts.
B.
Enable lot control for item A. Create three lots to represent the categories.
C.
Enable lot control for item A. Create three child lots and link them with the parent lot.
D.
Enable lot and grade control for item A. Have three categories mapped with grades.
E.
Enable lot and serial control for item A. Create one lot and three categories that are mapped
with serial numbers.
Explanation: