Using standard metrics, what is the maximum path cost in IS-IS?
A.
15
B.
16
C.
63
D.
1023
Explanation:
Using standard metrics, what is the maximum path cost in IS-IS?
Using standard metrics, what is the maximum path cost in IS-IS?
A.
15
B.
16
C.
63
D.
1023
Explanation:
its C
Actually its D 1023, according to the book JNCIS-ENT-Routing_2012-12-20 Appendix B-6:
‘IS-IS uses a single, required, default metric with a maximum path value of 1023.’
63 is the max link value, 1023 is the max path cost.
not c