Switch -1 was elected the root bridge and Switch-2 has a lower-cost path to the root bridge

Click the Exhibit button.
As shown in the exhibit, three switches are connected and participating in RSTP. Switch -1 was elected the root bridge and Switch-2 has a lower-cost path to the root bridge than Switch-3. Based on the details provided, which three statements are correct? (Choose three.)

Click the Exhibit button.

As shown in the exhibit, three switches are connected and participating in RSTP. Switch -1 was elected the root bridge and Switch-2 has a lower-cost path to the root bridge than Switch-3. Based on the details provided, which three statements are correct? (Choose three.)

A.
Switch-3’s ge-0/0/10.0 port assumes the alternate role and blocking state.

B.
Switch-3’s ge-0/0/10.0 port assumes the designated role and forwarding state.

C.
Switch-2’s ge-0/0/10.0 port assumes the designated role and forwarding state.

D.
Switch-1’s ports all assume the root port role and the forwarding state.

E.
Switch-1’s ports all assume the designated port role and the forwarding state.



Leave a Reply 2

Your email address will not be published. Required fields are marked *


seenagape

seenagape

I have the same idea.

Ryan

Ryan

Don’t be tricked by sw1 port assume root port and forwarding state comment.