you need to follow to achieve this?

You are designing a Load Plan in which you need to run Interfaces A and B one after the other
while running Interface C at the same time. Which steps do you need to follow to achieve this?

You are designing a Load Plan in which you need to run Interfaces A and B one after the other
while running Interface C at the same time. Which steps do you need to follow to achieve this?

A.
Add a Parallel step, add two Serial steps underneath it, and then add A and B to one serial step
and C to the other one

B.
Add a Parallel step, drag A and B and C into the Parallel step

C.
Add aParallel step, add two Parallel steps underneath it, and then add A and B to one Parallel
step and C to the other one

D.
Add a Parallel step, add three serial steps underneath it, and then add A to the first Serial step,
to the second one, and then C to the last one

Explanation:



Leave a Reply 2

Your email address will not be published. Required fields are marked *


António

António

A is the most correct.