You are designing a Load Plan in which you need to create multiple branches based on the value
of a variable. How do you implement this using the Load Plan editor?
A.
Drag the variable into Load Plan and define a Case Step
B.
Add a Case Step in Load Plan and select variable- in the wizard
C.
Create a scenario from the variable and add the scenario to Load Plan to create a Case Step
D.
Add a Case Step, then drag the variable into Case Step
Explanation:
http://docs.oracle.com/cd/E28271_01/integrate.1111/e12643/loadplans.htm#CHDEIFJJ
I think the answer is B.
It’s definitely B!
I think the answer is B, cause pptx of Oracle 10.ODI 11G Load Plans.pptx
B is correct