which three actions should be performed?

When bringing up a QFX3000-M QFabric system control plane network, which three actions should
be performed? (Choose three.)

When bringing up a QFX3000-M QFabric system control plane network, which three actions should
be performed? (Choose three.)

A.
Confirm data plane connections on EX Series switches are up.

B.
Apply site-specific configuration to EX Series switches.

C.
Verify connectivity and state of LAG between EX Series switches.

D.
Configure the network Node group.

E.
Power on the EX Series switches.



Leave a Reply 0

Your email address will not be published. Required fields are marked *