What is the recommended method for installing a virtual chassis for the first time?
A.
Cable all switches up forming a “closed loop” and then power up all switches at the same time.
B.
Always power up the desired master switch first and assign it with the highest mastership priority.
C.
Switch that is powered up last always becomes the master switch.
D.
Power up all switches simultaneously; then interconnect them to form the virtual chassis.