which corrective action would solve this problem?

A customer on MSTI-2 was isolated due to a physical link outage on Switch 5’s ge-0/0/32 interface.
Referring to the exhibit, which corrective action would solve this problem?

A customer on MSTI-2 was isolated due to a physical link outage on Switch 5’s ge-0/0/32 interface.
Referring to the exhibit, which corrective action would solve this problem?

A.
Replace the link between Switch 5 and Switch 6 with a 10 Gbps link.

B.
Implement the CIST on all switches.

C.
Move the root bridge for MSTI-2 to Switch 6.

D.
Add MSTI-2 to all interfaces on Switch 5.



Leave a Reply 0

Your email address will not be published. Required fields are marked *