A customer on MSTI-2 was isolated due to a physical link outage on Switch 5’s ge-0/0/32 interface.
Referring to the exhibit, which corrective action would solve this problem?
A.
Replace the link between Switch 5 and Switch 6 with a 10 Gbps link.
B.
Implement the CIST on all switches.
C.
Move the root bridge for MSTI-2 to Switch 6.
D.
Add MSTI-2 to all interfaces on Switch 5.