Which two requirements would lead towards a high availability solution?
A.
When uptime is critical
B.
When data must be refactored
C.
When application concurrency is static
D.
When data loss is unacceptable
E.
When application is a single point of failure
Explanation:
A,D
Yes, A,D
I think D\E,Somebody can explain to me?
A,D
A D AND E
I feel A and E. Critical Uptime refers to availability as well as there should be no single point of failure because spof means no availability if that point goes down. Data loss can be unacceptable even in a non-HA environment…for that we can use a DR solution.