An administrator has scheduled a report to run at 8 PM nightly and has configured a number
of recipients to receive the report. After the report runs, the administrator discovers that a
link to the report was sent to the recipients, not the report itself. Why did this occur?
A.
The SMTP server was configured not to accept attachments.
B.
vCenter Chargevack was configured to send links instead of attachments.
C.
vCenter Chargeback cannot support attachments via email.
D.
The report size was larger than the size limit configured for the SMTP server.