Which three statements are true about Consolidated Database Replay?
A.
Multiple replay schedules can be defined for a consolidated replay and during replay
initialization, you can select from any of the existing replay schedules.
B.
The number of captured workloads must be the same as the number of PDBs in a
multitenant CDB.
C.
A subset of the captured workload can be replayed.
D.
The workload capture and replay systems must have the same operating system (OS).
E.
Multiple workload captures from multiple databases can be replayed simultaneously on
all pluggable databases (PDBs) in a multitenant container database (CDB).
ACE