Identify the right approach.

You have developed a BPEL process with a Switch activity using the BPEL 1.1 specification. As
part of the upgrade to SOA 12c, you are redesigning the
BPEL process to use the BPEL 2.0 specification.
Identify the right approach.

You have developed a BPEL process with a Switch activity using the BPEL 1.1 specification. As
part of the upgrade to SOA 12c, you are redesigning the
BPEL process to use the BPEL 2.0 specification.
Identify the right approach.

A.
Replace the Switch activity with a While activity.

B.
Replace the Switch activity with an If activity.

C.
Replace the Switch activity with a Repeat Until activity.

D.
Replace the Switch activity with a For Each activity.



Leave a Reply 1

Your email address will not be published. Required fields are marked *