Your customer has two manufacturing plants. The manufacturing process for both the plants is identical,
but there are differences in specific areas.
1. Plant 1 uses min-max planning and Plant 2 uses re-order point planning.
2. Plant 1 and Plant 2’s Variable Lead Times are different.
3. Plant 1 and Plant 2 use two different WIP (Work In Process) supply subinventories.
Which two attribute control settings meet the requirement? (Choose two.)
A.
Organization Level: WIP Supply Subinventory
B.
Master Level: Stockable, Transactable, Build in WIP
Organization Level: Inventory Planning Method
C.
Organization Level: Variable Lead Time, WIP Supply Subinventory
D.
Master Level: Stockable, Variable Lead Time, Inventory Planning Method Organization Level:
Transactable
E.
Master Level: Transactable, Inventory Planning Method, Variable Lead Time
F.
Master Level: WIP Supply Subinventory, Variable Lead Time, Stockable, Transactable, Build in WIP