Which two attribute control settings meet the requirement?

Your customer has two manufacturing plants. The manufacturing process for both the plants is identical,
but there are differences in specific areas.
1. Plant 1 uses min-max planning and Plant 2 uses re-order point planning.
2. Plant 1 and Plant 2’s Variable Lead Times are different.
3. Plant 1 and Plant 2 use two different WIP (Work In Process) supply subinventories.

Which two attribute control settings meet the requirement? (Choose two.)

Your customer has two manufacturing plants. The manufacturing process for both the plants is identical,
but there are differences in specific areas.
1. Plant 1 uses min-max planning and Plant 2 uses re-order point planning.
2. Plant 1 and Plant 2’s Variable Lead Times are different.
3. Plant 1 and Plant 2 use two different WIP (Work In Process) supply subinventories.

Which two attribute control settings meet the requirement? (Choose two.)

A.
Organization Level: WIP Supply Subinventory

B.
Master Level: Stockable, Transactable, Build in WIP
Organization Level: Inventory Planning Method

C.
Organization Level: Variable Lead Time, WIP Supply Subinventory

D.
Master Level: Stockable, Variable Lead Time, Inventory Planning Method Organization Level:
Transactable

E.
Master Level: Transactable, Inventory Planning Method, Variable Lead Time

F.
Master Level: WIP Supply Subinventory, Variable Lead Time, Stockable, Transactable, Build in WIP



Leave a Reply 0

Your email address will not be published. Required fields are marked *