Which of the 7 requirements are met by your plan?

You must deploy several Oracle 12c databases on an Oracle Grid Infrastructure Managed Cluster, and are required to have the ability to perform these actions without down time:
1. Apply a Grid Infrastructure interim patch.
2. Apply a Grid Infrastructure Patch Set Update (PSU).
3. Apply a database on-line patch.
4. Apply a Grid Infrastructure patchset.
5. Apply a database patchset.
6. Upgrade Grid Infrastructure from one release to another.
7. Upgrade databases from one release to another.

Your plan is to perform these tasks:
1. Install and configure Oracle Grid Infrastructure on a local le system.
2. Install Oracle Database software on an ACFS le system.
3. Create several RAC One Node databases.
Which of the 7 requirements are met by your plan?

You must deploy several Oracle 12c databases on an Oracle Grid Infrastructure Managed Cluster, and are required to have the ability to perform these actions without down time:
1. Apply a Grid Infrastructure interim patch.
2. Apply a Grid Infrastructure Patch Set Update (PSU).
3. Apply a database on-line patch.
4. Apply a Grid Infrastructure patchset.
5. Apply a database patchset.
6. Upgrade Grid Infrastructure from one release to another.
7. Upgrade databases from one release to another.

Your plan is to perform these tasks:
1. Install and configure Oracle Grid Infrastructure on a local le system.
2. Install Oracle Database software on an ACFS le system.
3. Create several RAC One Node databases.
Which of the 7 requirements are met by your plan?

A.
1, 2, 3, 4, 5, 6 and 7.

B.
1, 2, 3, 4 and 6.

C.
1, 2, 3, 4, 5 and 6.

D.
1, 2, 3 and 4.

E.
2, 3, 4 and 6.

F.
2, 3, 4, 5 and 6.



Leave a Reply 3

Your email address will not be published. Required fields are marked *