You must deploy several Oracle 12c databases on an Oracle Grid Infrastructure Managed Cluster, and are required to have the ability to perform these actions without down time:
1. Apply a Grid Infrastructure interim patch.
2. Apply a Grid Infrastructure Patch Set Update (PSU).
3. Apply a database on-line patch.
4. Apply a Grid Infrastructure patchset.
5. Apply a database patchset.
6. Upgrade Grid Infrastructure from one release to another.
7. Upgrade databases from one release to another.
Your plan is to perform these tasks:
1. Install and configure Oracle Grid Infrastructure on a local le system.
2. Install Oracle Database software on an ACFS le system.
3. Create several RAC One Node databases.
Which of the 7 requirements are met by your plan?
A.
1, 2, 3, 4, 5, 6 and 7.
B.
1, 2, 3, 4 and 6.
C.
1, 2, 3, 4, 5 and 6.
D.
1, 2, 3 and 4.
E.
2, 3, 4 and 6.
F.
2, 3, 4, 5 and 6.
Correct: B
D
Nope, it’s B.