Your project requires a loop through the same package logic 24/7. You must be able to purge those executions
when required. How do you accomplish this? (Choose the best answer.)
A.
Link the last step of the package to its first step to create an infinite loop.
B.
Create a scenario from the package, add the scenario as the last step in the package, run it
asynchronously, and then save and regenerate this scenario.
C.
Create a scenario from the package, add the scenario as the last step in the package, run it
asynchronously, and then save.
D.
Drag the package to the last step in the package, run it asynchronously, and then save.
Explanation:
(http://www.rittmanmead.com/2015/04/di-tips-odi-convert-to-flow/)