Because of a motherboard failure on an X6 high-capacity Exadata storage server, you must replace the server
chassis with a replacement unit.
Which are three of the components must you move from the original Exadata storage server to the new
Exadata storage server?
A.
Redundant power supplies
B.
The host bus channel adaptor
C.
The USB flash drive
D.
The four Sun Flash Accelerator PCIe cards
E.
The 12 physical disks
Explanation:
Remove the following reusable components:
Fan modules
SAS storage drive cables
PCIe cards
Power supplies
References: https://docs.oracle.com/cd/E62172_01/html/E63689/goiqw.html#scrolltoc