When performing the Oracle recommended bonding of NETl/NETZ or NET4/NET5, what other step should be
completed in order to ensure connectivity, in case of a network hardware outage?
A.
Each link should terminate at a separate switch to provide network redundancy.
B.
NET0/NET3 should also be bonded and linked to a separate network.
C.
The MTU should be set to 7000 to improve performance.
D.
Jumbo Frames should be disabled.
E.
STP should be disabled to prevent routing loops.
ok.
OK