Which of the following describes the anticipated time until a solution component may fail?
A.
Recovery time objective
B.
Recovery point objective
C.
Mean time between failures
Explanation:
The recovery time objective (RTO)—also known as the return to operation—is the amount of timeit
takes to restore a service after a failure has taken place. The recovery point objective (RPO) is the
point intime to which the system needs to be restored following a failure. The MTBF is the amount
of time acomponent is predicted to fail and can be used with operational management or design
concepts.