Which of the following needs to be considered when determining the amount and size of the hosts required for a virtual design?

Which of the following needs to be considered when determining the amount and size of the hosts
required for a virtual design?

Which of the following needs to be considered when determining the amount and size of the hosts
required for a virtual design?

A.
Aggregate CPU and memory requirements

B.
Future growth

C.
Number of vCPUs to be hosted per box

D.
All of the above

Explanation:

When attempting to determine the host requirements of a virtual design, you need to
determineaggregate CPU and memory requirements, number of virtual CPUs, number of cores
available, maximumutilization, socket and core availability, and future growth.