As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a
change to one Single Sign-On instance is propagated to the other instances? (Choose two.)
A.
Schedule a Replication Task on the primary instance
B.
Select the first instance during the installation of subsequent instances
C.
During the installation of each instance choose Linked-Mode
D.
Enable Synchronize to Active Directory on each instance
The bottom of page 51 in this article indicates to me that answers B & C are the correct ones: http://pubs.vmware.com/vsphere-55/topic/com.vmware.ICbase/PDF/vsphere-esxi-vcenter-server-55-installation-setup-guide.pdf
Yes Philip, you are correct.