A vSphere 5 implementation contains two ESXi hosts, ESXi01 and ESXi02. A virtual machine, VM21a on ESXi01 is connected to a vSphere Standard Switch (vSS) in a port group called Production. The vSS is connected to an uplink on the 10.1.20.0/24 network. ESXi02 is configured with a vSS connected to an uplink on the 10.1.30.0/24 network. A port group called Engineering exists on this switch.
Which two statements are true about this configuration? (Choose two.)
A.
Broadcasts from the Production port group can be received on the Engineering port group.
B.
Broadcasts from the Production port group can not be received on the Engineering port group.
C.
The virtual machine can be vMotion migrated to the target host.
D.
The virtual machine can not be vMotion migrated to the target host.