An offsite information processing facility with electrical wiring, air conditioning and flooring, but no computer or
communications equipment, is a:
A.
cold site.
B.
warm site.
C.
dial-up site.
D.
duplicate processing facility.
Explanation:
A cold site is ready to receive equipment but does not offer any components at the site in advance of the need.
A warm site is an offsite backup facility that is partially configured with network connections and selected
peripheral equipment-such as disk and tape units, controllers and CPUs-to operate an information processing
facility. A duplicate information processing facility is a dedicated, self-developed recovery site that can back up
critical applications.