Risks with low ratings of probability and impact are included on a ____ for future monitoring.
A.
Observation list
B.
Risk register
C.
Watch list
D.
Risk alarm
Explanation:
Watch list contains risks with low rating of probability and impact. This list is useful for future monitoring of low risk ors.
Answer option B is incorrect. Risk register is a document that contains the results of the qualitative risk analysis, quantitative risk analysis, and risk response planning. Description, category, cause, probability of occurring, impact on objectives, proposed responses, owner, and the current status of all identified risks are put in the risk register.
Answer options B and D are incorrect. No such documents as risk alarm and observation list is prepared during risk identification process.
Reference: "A Guide to the Project Management Body of Knowledge, (PMBOK Guide), Fourth Edition."