DRAG DROP
A company’s SharePoint environment contains a single web application with a root site collection
that hosts the company intranet site.
The company plans to allow project managers to create project-specific sites and assign permissions
for those sites to project team members.
The project sites will contain large files.
You have the following requirements:
Create a separate area of the intranet site for the purpose of containing project sites.
Assign a distinct URL to the project site area.
Ensure that project managers can create project sites and add users to project sites.
Ensure that project site data is stored separately from other intranet site content.
You need to create and configure the project site area.
Which three actions should you perform in sequence? (To answer, move the appropriate actions
from the list of actions to the answer area and arrange them in the correct order.)
Answer: See the explanation
Explanation:
* Create managed path for the web application
* In a content database separate from that of the intranet site create a site collection
* In the root site for the site collection, grant permissions
Define managed paths in SharePoint Server 2013