You need to prepare the infrastructure for the planned deployment

Your network contains a System Center 2012 Virtual Machine Manager (VMM) infrastructure. The
infrastructure contains 50 Hyper-V hosts. You plan to deploy Power Optimization for VMM. You
need to prepare the infrastructure for the planned deployment. What should you do? (Each correct
answer presents part of the solution. Choose two.)

Your network contains a System Center 2012 Virtual Machine Manager (VMM) infrastructure. The
infrastructure contains 50 Hyper-V hosts. You plan to deploy Power Optimization for VMM. You
need to prepare the infrastructure for the planned deployment. What should you do? (Each correct
answer presents part of the solution. Choose two.)

A.
Install a Baseboard Management Controller (BMC) on each Hyper-V host.

B.
Enable Dynamic Optimization.

C.
Enable Hibernation.

D.
Enable Performance and Resource Optimization (PRO).

E.
Install a configuration provider on each Hyper-V host.

Explanation:
A: To use Power Optimization, the host computers must have a BMC that enables out-of- band
management.
B: Power Optimization is an optional feature of Dynamic Optimization, and it is only available when a
host group is configured to migrate virtual machines through Dynamic Optimization.
Configuring Dynamic Optimization and Power Optimization in VMM



Leave a Reply 0

Your email address will not be published. Required fields are marked *