Which four actions should you perform in sequence?

DRAG DROP
You are planning to set up a proof-of-concept network virtualization environment. The
environment will contain three servers. The servers will be configured as shown in the
following table.

You need to enable network connectivity between the virtual machines and Server3.
Which four actions should you perform in sequence? To answer, move the appropriate
actions from the list of actions to the answer area and arrange them in the correct order.

DRAG DROP
You are planning to set up a proof-of-concept network virtualization environment. The
environment will contain three servers. The servers will be configured as shown in the
following table.

You need to enable network connectivity between the virtual machines and Server3.
Which four actions should you perform in sequence? To answer, move the appropriate
actions from the list of actions to the answer area and arrange them in the correct order.

Answer: See the explanation

Explanation:
Box 1:

Box 2:

Box 3:

Box 4: