You work as the network administrator at ABC.com. You have recently implemented a Project Server 2010 environment. A Windows Server 2008 R2 server named ABC-SQL1 runs SQL Server 2008 R2. A Windows Server 2008 R2 server named ABC-SPS1 runs SharePoint Server 2010 and Project Server 2010. You are planning a disaster recovery plan for the Project Server 2010 environment. You need to be able to recover from a total system failure. Which backup strategy should you use for the Project Server 2010 environment?
A.
You should open SharePoint Central Administration on ABC-SPS1 and schedule a full farm backup.
B.
You should configure SQL Server on ABC-SQL1 to back up all the databases.
C.
You should configure Windows Server Backup on ABC-SPS1 to back up all volumes on the server.
D.
You should open Project Web App (PWA) on ABC-SPS1 and configure the Daily Backup Schedule.