An organization uses SharePoint Server collaboration sites for all projects. Each project has a unique site.
Project team members have Contribute permission levels to each project site of which they are members.
Sites for completed projects must meet the following requirements:
The project team members must be able to access files.
They must be prohibited from editing or deleting files.
They must not be able to change site permissions.You need to configure the SharePoint environment to meet the requirements.
Which three actions should you perform in sequence? (To answer, move the appropriate actions from the list of
actions to the answer area and arrange them in the correct order.)
Select and Place:
Explanation:
Box 1:Box 2:
Box 3:
Note:
* The Records Center was introduced in 2007 as a SharePoint site that served as a conventional records
archive. Content from all over the enterprise can be submitted to a Records Center and then routed to the
appropriate place where it picks up the right permissions and policies,
such as expiration and auditing.
Incorrect:*You must have the Manage Permissions permission to configure site permissions. In SharePoint Server, by
default only the Full Control and Manage Hierarchy permission levels include this permission.