Which three actions should you perform in sequence?

DRAG DROP
You are the Office 365 administrator for your company. The company is deploying Office 365 ProPlus.
The company has the following deployment requirements:
Office applications must be installed from a local network location by using a self-service model.
Office application updates must not be deployed until they have been tested for compatibility.
The installation of Office applications and updates must occur without user interaction.
You need to deploy Office 365 ProPlus.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of
actions to the answer area and arrange them in the correct order.
Select and Place:

DRAG DROP
You are the Office 365 administrator for your company. The company is deploying Office 365 ProPlus.
The company has the following deployment requirements:
Office applications must be installed from a local network location by using a self-service model.
Office application updates must not be deployed until they have been tested for compatibility.
The installation of Office applications and updates must occur without user interaction.
You need to deploy Office 365 ProPlus.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of
actions to the answer area and arrange them in the correct order.
Select and Place:

Answer:

Explanation:
A new build of Office 365 ProPlus is released to the Microsoft Content Delivery Network (CDN) every 2nd
Tuesday of every month. You would therefore need to configure a content delivery network.
You can configure Office 365 ProPlus to get updates automatically from a location on your network, i.e.
distribution point, using the Office Deployment Tool or Group Policy. This is a good option if you want to test to
make sure that your line-of-business applications work with the new version.
The Office Deployment Tool makes use of a Configuration.xml file, which includes the instructions for what
Office software to download from Office 365.References:
http://blogs.technet.com/b/office_resource_kit/archive/2014/01/28/managing-updates-for-office-365-propluspart-2.aspx
https://technet.microsoft.com/en-us/library/cc179070.aspx#BKMK_RunSetupFromLIS
https://support.office.com/en-us/article/Content-delivery-networks-0140f704-6614-49bb-aa6c-89b75dcd7f1f?
ui=en-US&rs=en-US&ad=US



Leave a Reply 2

Your email address will not be published. Required fields are marked *


ArneT.

ArneT.

No CDN should be configured. (Remove this step)
You need to configure a GPO to install using the XML file (Add as last step)

Here are the high-level steps for a fully automated testing and deployment process:
– Identify a “testing” group
– Configure testing group to get their updates from an internal source
– Configure all others to get their updates from a different internal source
– Update the testing source after every Patch Tuesday
– Have your testing group use Office
– Update the production testing source 2-3 weeks later
– Enable a back out strategy

(https://blogs.technet.microsoft.com/office_resource_kit/2014/01/28/managing-updates-for-office-365-proplus-part-2/)

Ricky

Ricky

create a software distribution point…
Configure an installation xml…
configure a gruop policy to use the xml file