you need to do before you can enable Power Optimization in VMM?

Your role of Systems Administrator at ABC.com includes the management of the company’s
System Center 2012 Virtual Machine Manager (VMM) infrastructure.
The VMM infrastructure includes 80 Windows Server 2008 R2 Hyper-V host servers. The servers
are configured as 8-node host clusters. Each host server has a Baseboard Management
Controller (BMC). Each cluster is configured for live migration.
You want to enable Power Optimization to save energy by turning off hosts that are not needed to
meet resource requirements within a host cluster.
What do you need to do before you can enable Power Optimization in VMM?

Your role of Systems Administrator at ABC.com includes the management of the company’s
System Center 2012 Virtual Machine Manager (VMM) infrastructure.
The VMM infrastructure includes 80 Windows Server 2008 R2 Hyper-V host servers. The servers
are configured as 8-node host clusters. Each host server has a Baseboard Management
Controller (BMC). Each cluster is configured for live migration.
You want to enable Power Optimization to save energy by turning off hosts that are not needed to
meet resource requirements within a host cluster.
What do you need to do before you can enable Power Optimization in VMM?

A.
You need to enable Performance and Resource Optimization (PRO).

B.
You need to enable a load balancer.

C.
You need to enable Dynamic Optimization.

D.
You need to install System Center 2012 Orchestrator.



Leave a Reply 0

Your email address will not be published. Required fields are marked *