You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server has a backup tape drive installed.
You need to schedule a backup to tape. The tape must be ejected when the backup job is complete.
Which commands should you include in the scheduled task?
A.
Devcon.exe and Poolmon.exe
B.
Ntbackup.exe and Devcon.exe
C.
Ntbackup.exe and Rsm.exe
D.
Rsm.exe and Poolmon.exe