Which three are logistical issues that need to be taken into consideration prior to performing a site survey?
What are the three deployment results of the 5 GHz radio on channel size, spatial stream, and data rate?
Drag from the left the maximum power, and drop it under the appropriate UNII channel band regarding the FCC domain…
Drag from the left the acceptable minimum call overlap for data and voice cells for site survey and deployment.
Drag from the left the minimum requirements needed for a location based survey and deployment and drop them on the right.
Drag from the left the preferred parameters withoutexcess from location service survey and deployment…