Which three steps should you perform in sequence?

DRAG DROP
You are editing a SQL Server Integration Services (SSIS) package that contains a task with
a sensitive property.
You need to create a project parameter and configure it so that its value is encrypted when it
is deployed to the SSIS catalog.
Which three steps should you perform in sequence? (To answer, move the appropriate
actions from the list of actions to the answer area and arrange them in the correct order.)

DRAG DROP
You are editing a SQL Server Integration Services (SSIS) package that contains a task with
a sensitive property.
You need to create a project parameter and configure it so that its value is encrypted when it
is deployed to the SSIS catalog.
Which three steps should you perform in sequence? (To answer, move the appropriate
actions from the list of actions to the answer area and arrange them in the correct order.)

Answer:

Explanation:



Leave a Reply 5

Your email address will not be published. Required fields are marked *


!aMbo

!aMbo

second box should be replace by “….scope to project”

Islam

Islam

yupe agreed

Slazenjer_m

Slazenjer_m

Agree with !aMbo…

Create a Project parameter by setting it to project-scoped.

Tanzila

Tanzila

Agreed with aMbo