Which three steps should you perform in sequence?

DRAG DROP
You are editing a SQL Server Integration Services (SSIS) package that contains a task with a sensitive
property.
You need to create a project parameter and configure it so that its value is encrypted when it is
deployed to the SSIS catalog.
Which three steps should you perform in sequence? (To answer, move the appropriate actions from the
list of actions to the answer area and arrange them in the correct order.)

DRAG DROP
You are editing a SQL Server Integration Services (SSIS) package that contains a task with a sensitive
property.
You need to create a project parameter and configure it so that its value is encrypted when it is
deployed to the SSIS catalog.
Which three steps should you perform in sequence? (To answer, move the appropriate actions from the
list of actions to the answer area and arrange them in the correct order.)

Answer:



Leave a Reply 4

Your email address will not be published. Required fields are marked *