You need to identify which type of information you can obtain by performing bill of materials
(BOM) calculations? Which three types of information should you identify? Each correct
answer presents part of the solution.
A.
The projected sales prices and costs of BOM Items manufactured in different quantities
B.
The quantity of raw materials required to manufacture the BOM item
C.
The projected sales quantity of the BOM item
D.
The profit margins and contribution ratios
E.
The maximum production run size for the BOM
Explanation:
A is correct without doubts.
What about the rest?
I’d choose ABD