You create a new sales order for an item that has a bill of materials (BOM) and a
configuration. You select a new configuration for the item. You need the sales price on the
sales order to reflect the options selected in the configuration of the BOM. What should you
do?
A.
Perform a components explosion on the line.
B.
Select the correct sub-BOM on the line.
C.
Perform a requirement explosion on the line.
D.
Perform a BOM calculation on the line.
Bom Calculation
Probably D
https://technet.microsoft.com/en-us/library/gg232253.aspx