Which of the following actions should you take?

You are employed as an administrator at ABC.com. ABC.com makes use of Microsoft Dynamics
AX 2012 in their production environment.
You are configuring an activity of a Lean Manufacturing project flow to enable the option to register
scrap. You now need to specify the scrap factor when doing a backflush.
Which of the following actions should you take?

You are employed as an administrator at ABC.com. ABC.com makes use of Microsoft Dynamics
AX 2012 in their production environment.
You are configuring an activity of a Lean Manufacturing project flow to enable the option to register
scrap. You now need to specify the scrap factor when doing a backflush.
Which of the following actions should you take?

A.
You should consider accessing the picking list lines.

B.
You should consider accessing the purchase order lines.

C.
You should consider accessing the BOM lines.

D.
You should consider accessing the calculation proposal lines.

Explanation:



Leave a Reply 0

Your email address will not be published. Required fields are marked *