Which of the following actions should you take?

You are employed as an administrator at ABC.com. ABC.com makes use of Microsoft Dynamics

AX 2012 in their production environment.
You have previously created a Kanban process job, and configured it to have a status of Planned.
You have been instructed to change the status of the job to Not planned.
Which of the following actions should you take?

You are employed as an administrator at ABC.com. ABC.com makes use of Microsoft Dynamics

AX 2012 in their production environment.
You have previously created a Kanban process job, and configured it to have a status of Planned.
You have been instructed to change the status of the job to Not planned.
Which of the following actions should you take?

A.
You should consider cancelling the job.

B.
You should consider navigating to the Kanban board for process jobs to change the status.

C.
You should consider marking the job as Complete, then recreate the job with the Not planned
status.

D.
You should consider marking the job as Prepared before changing the status.

Explanation: