You are employed as an administrator at ABC.com. ABC.com makes use of Microsoft Dynamics
AX 2012 in their production environment.
You have been instructed to create a new version of an existing Lean Manufacturing production
flow. You are required to make sure that both the kanban rules that reference the existing
production flow, as well as the production flow activities is copied from the existing production flow
version to the new version.
What actions should you take? (Choose two.)
A.
You should consider disabling the Duplicate Kanban rules option.
B.
You should consider enabling the Duplicate Kanban rules option.
C.
You should consider disabling the Copy from version option.
D.
You should consider enabling the Copy from version option.
Explanation: