An administrator wants to verify that a new PRI is properly connected to the PSTN status.
Which Layer 2 status should be seen?
A.
MULTIPLE_FRAME_ESTABLISHED
B.
TEI_ASSIGNED
C.
LINK_UP
D.
CONTROLLER_UP
An administrator wants to verify that a new PRI is properly connected to the PSTN status.
Which Layer 2 status should be seen?
An administrator wants to verify that a new PRI is properly connected to the PSTN status.
Which Layer 2 status should be seen?
A.
MULTIPLE_FRAME_ESTABLISHED
B.
TEI_ASSIGNED
C.
LINK_UP
D.
CONTROLLER_UP