The formal process that must be performed at the end of the project to provide the final inspection of the product is called:

The formal process that must be performed at the end of the project to provide the final inspection
of the product is called:

The formal process that must be performed at the end of the project to provide the final inspection
of the product is called:

A.
methodology verification.

B.
scope verification.

C.
change verification.

D.
system verification.



Leave a Reply 0

Your email address will not be published. Required fields are marked *