Which of the following is the FIRST step that should be taken before submitting a change control form?

While performing a scheduled walkthrough at a construction site, the customer points out a
discrepancy. Which of the following is the FIRST step that should be taken before
submitting a change control form?

While performing a scheduled walkthrough at a construction site, the customer points out a
discrepancy. Which of the following is the FIRST step that should be taken before
submitting a change control form?

A.
Consult the project sponsor

B.
Identify the change

C.
Perform a feasibility study

D.
Perform impact analysis