Which three steps should you perform in sequence?

DRAG DROP
You are editing a SQL Server Integration Services (SSIS) package that contains a task with
a sensitive property.
You need to create a project parameter and configure it so that its value is encrypted when it
is deployed to the SSIS catalog.
Which three steps should you perform in sequence? (To answer, move the appropriate
actions from the list of actions to the answer area and arrange them in the correct order.)

DRAG DROP
You are editing a SQL Server Integration Services (SSIS) package that contains a task with
a sensitive property.
You need to create a project parameter and configure it so that its value is encrypted when it
is deployed to the SSIS catalog.
Which three steps should you perform in sequence? (To answer, move the appropriate
actions from the list of actions to the answer area and arrange them in the correct order.)

Answer:

Explanation:



Leave a Reply 4

Your email address will not be published. Required fields are marked *


Manuel

Manuel

I agree with dbo, and I disagree with the provided solution

Jeph Bayfield

Jeph Bayfield

Yes i clearly says Project Parameter so:

Right Click Paramaterize
Set Scope to Project
Sensitive Property = True