You need to design an ETL process that meets the requirements

You are designing an extract, transform, load (ETL) process for loading data from a SQL Server database
into a large fact table in a data warehouse each day with the prior day’s sales data.
The ETL process for the fact table must meet the following requirements:
 Load new data in the shortest possible time.
 Remove data that is more than 36 months old.
 Ensure that data loads correctly.
 Minimize record locking.
 Minimize impact on the transaction log.
You need to design an ETL process that meets the requirements. What should you do? (More than one
answer choice may achieve the goal. Select the BEST answer.)

You are designing an extract, transform, load (ETL) process for loading data from a SQL Server database
into a large fact table in a data warehouse each day with the prior day’s sales data.
The ETL process for the fact table must meet the following requirements:
 Load new data in the shortest possible time.
 Remove data that is more than 36 months old.
 Ensure that data loads correctly.
 Minimize record locking.
 Minimize impact on the transaction log.
You need to design an ETL process that meets the requirements. What should you do? (More than one
answer choice may achieve the goal. Select the BEST answer.)

A.
Partition the destination fact table by date. Insert new data directly into the fact table and delete old
data directly from the fact table.

B.
Partition the destination fact table by date. Use partition switching and staging tables both to remove
old data and to load new data.

C.
Partition the destination fact table by customer. Use partition switching both to remove old data and
to load new data into each partition.

D.
Partition the destination fact table by date. Use partition switching and a staging table to remove old
data. Insert new data directly into the fact table.